FIRST TWINNING OPERATION AT THE PORT OF NADOR

16 November 2024

Port and Logistics

The Operations Team at the Port of Nador carried out its first twinning operation on November 16, unloading a cargo of 1,312 tons of heavy lift cargo using two cranes simultaneously. The cargo is destined for the new wind turbine blade production plant being built in the region by Chinese customer AEOLON.

Three stopovers are scheduled to import the plant’s production tools and accessories. This first shipment involved various elements, including forms and bridges for moving packages inside the plant, measuring up to 44 meters.

Share this post